Reference: back

Title

CHEMICAL FACTORY, DAESAN

Customer

LG Chemicals

Markets

Energy & Mining

Country

South Korea

Courtesy of

Superior Products South Korea

Body

Project Description                       

 

Purpose of the project was to insulate the full installation system of an incinerator in order to improve energy efficiency.

 

Coating Solution

 

HOT PIPE COATING was applied to different elements of the plant.

Note:

  • A direct coating on the surface was done without a pre-treatment
  • Application was easy even in areas of frequent access points

 

Results

 

Result after insulation:

INCINERATOR (1) : △T = - 130°C

INCINERATOR (2) : △T = - 150°C

STRAINER (1) : △T = - 125°C

TRAP : △T = - 130°C

VALVE : △T = - 105°C

STRAINER (2) : △T = - 130°C

FLANGE (1) : △T = - 85°C

CHANNEL COVER : △T = - 105°C

FLANGE (2) : △T = - 130°C

reference: products we used

Products we used

Contact us button (gray)

 

We remain at your disposal for all enquiries you may have about our wide range of products. Have you not found the solution you are looking for, then let us find one for you.